Paper work before Construction of Residential Building

Construction of residential building required following paper work before the start of actual construction. These steps are;

  1. Preparation of drawings as per requirements of consumers.
  2. Estimation of material cost, labor cost & contingencies.
  3. Approval of drawings & estimates from Client.
  4. Approval of drawings from City Development Authority. It is most important because residential building drawings should meet the authority defined rules.
  5. Start of construction work either through contractor or labor hired on daily basis.
  6. Marking of plot boundaries.
  7. Cleaning of plot.
  8. Preparation of site layout as per drawing.

After the completion of documentation work, the actual construction on plot begins.

Leave a Reply

Your email address will not be published. Required fields are marked*

Get A Quote