CivilArch Group
Open Hall — ₹200/sqft surcharge for retaining wall & floor. Rooms Constructed — ₹400/sqft surcharge (extra walls, finishing & waterproofing).
AI Recommendation: Based on your building type, a lift is recommended for better accessibility and property value.
AI Auto-Package: Our AI will automatically compare all 3 packages — CoreBuilt, CoreFinish & CoreElite — and recommend the best fit for your project.
Click to upload or drag & drop your floor plan
Uploading improves estimate accuracy significantly
* Approx cost excluding GST. GST extra as applicable.
Switch between packages to view full cost breakdown, materials & download individual PDF reports
Only Grey Construction Package. Includes Foundation, RCC Structure, Brickwork & Internal/External Plaster only. No flooring, painting, electrical, plumbing, doors, windows, sanitary fixtures, false ceiling, modular kitchen or interior work is included. Ideal for customers who want to complete the finishing work themselves.
A complete Semi Furnished Home Package including premium construction with flooring, painting, doors, windows, electrical, plumbing, sanitary fittings and all essential finishing works. Interior furniture, false ceiling and modular kitchen are not included.
Everything included in CoreFinish, plus:
Furniture and complete interior design are not included.
Everything included in CoreElite, plus:
A Ready-to-Move Premium Home Package with Construction + Interior under one roof.
CoreBuilt → Only Grey Structure · CoreFinish → Semi Furnished · CoreElite → Semi Furnished + False Ceiling + Modular Kitchen · CoreElite+ → Complete Interior Included (Ready-to-Move Luxury Package)
Stage-wise payment plan followed for all packages. The RCC Slab and Brickwork+Plaster stages repeat for every floor, so their per-floor share depends on your total number of floors.
| Construction Stage | Payment |
|---|---|
| Booking Advance | 10% |
| Foundation Complete | 10% |
| Plinth Complete | 10% |
| Each Floor RCC Slab | 35% ÷ Total Floors |
| Each Floor Brickwork + Plaster | 20% ÷ Total Floors |
| Finishing / Interior Work (Package-wise) | 10% |
| Final Inspection & Handover | 5% |
| Total | 100% |
Per-floor RCC Slab & Brickwork share by building height:
| Building Type | RCC Slab (Per Floor) | Brickwork + Plaster (Per Floor) |
|---|---|---|
| G+1 (2 Floors) | 17.50% | 10.00% |
| G+2 (3 Floors) | 11.67% | 6.67% |
| G+3 (4 Floors) | 8.75% | 5.00% |
| G+4 (5 Floors) | 7.00% | 4.00% |
Your specific number of floors is highlighted automatically once your estimate is generated above.
Get expert consultation, detailed BOQ, design planning and construction guidance from CivilArch Group.
Disclaimer: This estimate is AI-generated and approximate. Actual construction cost may vary based on city, market rate, site condition, soil condition, labour rate, material brand, design complexity and final specification. Soil filling @ ₹100/sqft and Water Boring @ ₹1,25,000 are indicative. Miscellaneous charges up to ₹3,00,000 are advisory. Buildings above G+4 (i.e. more than 5 floors) carry a Heavy Structure surcharge of ₹200/sqft across the entire built-up area, to account for thicker RCC members, deeper foundation and extra reinforcement needed for taller structures. Basement work carries an additional surcharge of ₹200/sqft for retaining wall & floor costing (even for an open-hall layout), rising to ₹400/sqft if rooms are constructed inside the basement. Lift cost may vary by brand, capacity and installation. GST extra as applicable.
© 2025 CivilArch Group | civilarch.in
👋 Please share a few quick details — this helps Buildcost AI personalise your construction cost answers.
In just 30 min, get a free budget estimate & expert advice — no obligation.
By submitting this form, I confirm that I have read and agree to Civilarch Group's Privacy Policy.